Repairs, re-construction and modernization of machinery
DUMPER AE 40
On the ground of great height of DUMPER AE 40 the damper’s body and driving-out equipment which forces transported material out were modified.
The body and driving-out equipment were reduced by cutting with cutting torch and than completed by welding the material on.
Plough for cable laying
Plough is designed to lay the cables to the soil across railway. It is connected directly behind the locomotive. In order to provide bigger excavating power was the frame as well as the whole hydraulic part strengthened. The carried out changes were calculated by the finite element method before the realization.
|